BIMBA

教授

Mario Vanhoucke


    邮件:mario.vanhoucke@vlerick.be
教授综述

Mario Vanhoucke is Professor at Vlerick Business School, University College London and UGent. At the faculty of Economics and Business Administration of UGent, he heads the Operations Management and Information Science Center. In his research he focuses on project management (PM) using earned value management (EVM). His research has been published in renowned research outlets such as Management Science, Operations Research, The Accounting Review, Project Management Journal, The International Journal of Project Management, and two PM books published by Springer. He is Director of the EVM Europe Association (www.ev…

Mario Vanhoucke is Professor at Vlerick Business School, University College London and UGent. At the faculty of Economics and Business Administration of UGent, he heads the Operations Management and Information Science Center. In his research he focuses on project management (PM) using earned value management (EVM). His research has been published in renowned research outlets such as Management Science, Operations Research, The Accounting Review, Project Management Journal, The International Journal of Project Management, and two PM books published by Springer. He is Director of the EVM Europe Association (www.evm-europe.eu) which aims to advance the uptake and use of the EVM method in Europe. He is Partner of OR-AS (www.or-as.be) and Developer of the PM software tool ProTrack (www.protrack.be) and the online PM Knowledge Center (www.pmknowledgecenter.com). His research has received multiple awards by the International Project Management Association (IPMA), the Project Management Institute (PMI) and the American Accounting Association. Since 2011, he leads a research group which has obtained Concerted Research Actions (CRA) funding of more than € 1 million for an integrated PM research study, that will be carried out in collaboration with UGent, The European Organization for Nuclear Research (CERN, Switzerland), University College of London (UK) and George Washington University (USA).

现任
Professor at Vlerick Business School, University College London and Ugent
教授的课程
研究领域
Operations & Supply Chain Management
教育背景
工作经历

He is Partner of OR-AS (www.or-as.be) and Developer of the PM software tool ProTrack (www.protrack.be) and the online PM Knowledge Center (www.pmknowledgecenter.com).

荣誉
学术论文

Articles in refereed journals with impact

  • Sels V. Vanhoucke M.2014. A hybrid electromagnetism-like mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective. Computers and Industrial Engineering, 67(January): 44-55.

  • Van Peteghem V. Vanhoucke M.2014. An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. European Journal of Operational Research, 235(1): 62-72.

  • Van Peteghem V. Vanhoucke M.2013. An Artificial Immune System Algorithm for the Resource Availability Cost Problem. Flexible Services and Manufacturing, 25(1-2): 122-144.

  • Maenhout B. Vanhoucke M.2013. Reconstructing nurse schedules: computational insights in the problem size parameters. Omega - International Journal of Management Science, 41(5): 903-918.

  • Maenhout B. Vanhoucke M.2013. An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems. Omega - International Journal of Management Science, 41: 485-499.

  • Sels V. Vanhoucke M.2012. A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups. Computers and Operations Research, 39 (October 2012)(10): 2346-2358.

  • Sels V. Craeymeersch K. Vanhoucke M.2011. A hybrid single and dual population search procedure for the job shop scheduling problem. European Journal of Operational Research, 215: 512-523.

  • Coelho J. Vanhoucke M.2011. Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research, 213: 73-82.

  • Sels V. Vanhoucke M.2011. A hybrid dual-population genetic algorithm for the single machine maximum lateness problem. Lecture notes in Computer Science, 6622: 14-25.

  • Sels V. Steen F. Vanhoucke M.2011. Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber. Computers and Industrial Engineering, 61(3): 697-708.

  • Maenhout B. Vanhoucke M.2011. An evolutionary approach for the nurse rerostering problem. Computers and Operations Research, 38: 1400-1411.

  • Vanhoucke M.2011. On the dynamic use of project performance and schedule risk information during project tracking. Omega - International Journal of Management Science, 39: 416-426.

  • Maenhout B. Vanhoucke M.2010. A hybrid scatter search heuristic for personalized crew rostering in the airline industry. European Journal of Operational Research, 206(1): 155-167.

  • Van Peteghem V. Vanhoucke M.2010. A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. European Journal of Operational Research, 201(2): 409-418.

  • Vanhoucke M.2010. A scatter search heuristic for maximizing the net present value of a resource-constrained project with fixed activity cash flows. International Journal of Production Research, 48(7): 1983-2001.

  • Vanhoucke M.2010. Using activity sensitivity and network topology information to monitor project time performance. Omega - International Journal of Management Science, 38(5 (Oct)): 359-370.

  • Maenhout B. Vanhoucke M.2010. Branching strategies in a branch-and-price approach for multiple objective nurse scheduling problem. Journal of Scheduling, 13(1): 77-93.

  • Maenhout B. Vanhoucke M.2009. The impact of incorporating nurse-specific characteristics in a cyclical scheduling aproach. Journal of the Operational Research Society, 60(12): 1683-1698.

  • Vanhoucke M. Maenhout B.2009. On the characterization and generation of nurse scheduling problem instances. European Journal of Operational Research, 196(2): 457-467.

  • Vanhoucke M. Debels D.2009. A finite capacity production scheduling procedure for a belgian steel company. International Journal of Production Research, 47(3): 561-584.

  • Vanhoucke M.2009. A genetic algorithm for net present value maximization for resource constrained projects. Lecture notes in Computer Science, 5482: 13-24.

  • Van Peteghem V. Vanhoucke M.2009. An artificial immune system for the multi-mode resource-constrained project scheduling problem. Lecture notes in Computer Science, 5482: 85-96.

  • Labro E. Vanhoucke M.2008. Diversity in resource consumption patterns and costing system robustness to errors. Management Science, 54(10): 1715-1730.

  • Vanhoucke M. Coelho J. Debels D. Maenhout B. Tavares L.2008. An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research, 187(2): 511-524.

  • Vanhoucke M.2008. Setup times and fast tracking in resource-constrained project scheduling. Computers & Industrial Engineering, (54): 1062-1070.

  • Maenhout B. Vanhoucke M.2008. Comparison and hybridization of crossover operators for the nurse scheduling problem. Annals of Operations Research, 159(1): 333-353.

  • Vanhoucke M.2008. Set up times and fast tracking in resource-constrained project scheduling. Computers & Industrial Engineering, 54(4): 1062-1070.

  • Vanhoucke M. Debels D.2008. The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects. Computers & Industrial Engineering, 54(1): 140-154.

  • Labro E. Vanhoucke M.2007. A simulation analysis of errors in the design of costing systems. The Accounting Review, 82(4): 939-962.

  • Debels D. Vanhoucke M.2007. A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem. Operations Research, 55(3): 457-469.

  • Vanhoucke M. Vandevoorde S.2007. A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10): 1361-1374.

  • Maenhout B. Vanhoucke M.2007. An electromagnetic Meta-heuristic for the Nurse Scheduling Problem. Journal of Heuristics, 13(4): 359-385.

  • Maenhout B. Vanhoucke M.2007. A comparison and hybridization of crossover operators for the nurse scheduling problem. Annals of Operations Research, 159: 333-353.

  • Vanhoucke M. Debels D.2007. The discrete time/cost trade-off problem: extensions and heuristic procedures. Journal of Scheduling, 10(4-5): 311-326.

  • Debels D. De Reyck B. Leus R. Vanhoucke M.2006. A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling. European Journal of Operational Research, 169(2): 638-653.

  • Vanhoucke M.2006. Scheduling an R&D project with quality-dependent time-slots. Lecture notes in Computer Science, (3982): 621-630.

  • Maenhout B. Vanhoucke M.2006. New computational results for the nurse scheduling problem: a scatter search algorithm. Lecture notes in Computer Science, (3906): 159-170.

  • Vanhoucke M.2006. An efficient hybrid search procedure for various optimization problems. Lecture notes in Computer Science, (3906): 272-283.

  • Debels D. Vanhoucke M.2006. An Electromagnetism Meta-Heuristic for the Resource-Constrained Project Scheduling Problem. Lecture Notes on Computer Science, 3871: 259-270.

  • Vanhoucke M.2005. New computational results for the discrete time/cost trade-off problem with time-switch constraints. European Journal of Operational Research, 165(2): 359-374.

  • Debels D. Vanhoucke M.2005. A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem. Lecture notes in Computer Science, (3483): 378-387.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2003. Progress payments in project scheduling problems. European Journal of Operational Research, 148(3): 604-620.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2003. A random network generator for activity-on-the-node networks. Journal of Scheduling, 6(1): 13-34.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2002. Discrete time/cost trade-offs in project scheduling with time-switch constraints. Journal of the Operational Research Society, 53(7): 741-751.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2001. Scheduling projects with linearly time-dependent cash flows to maximize the net present value. International Journal of Production Research, 39: 3159-3181.

  • Sels V. Gheysen N. Vanhoucke M.. A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions. International Journal of Production Research,

  • Van Petegem P. Vanhoucke M.. Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. Journal of Heuristics,

  • Sels V. Vanhoucke M.. A dual-population genetic algorithm for the single machine maximum lateness problem. Lecture notes in Computer Science,

Articles in other (un)refereed journals

  • Vanhoucke M.2013. An overview of recent research results and future research avenues using simulation studies in project management. ISRN Computational Mathematics, : 1-19.

  • Vanhoucke M.2013. Measuring schedule adherence. The Measurable News, (4): 21-26.

  • Vanhoucke M.2013. Project baseline scheduling: an overview of past experiences. Journal of Modern Project Management, 1(2): 18-27.

  • Vanhoucke M.2013. Project management using dynamic scheduling: baseline scheduling, risk analysis and project control. The Measurable News, (4): 21-26.

  • Vanhoucke M.2012. Measuring the efficiency of project control using fictitious and empirical project data. International Journal of Project Management, 30: 252-263.

  • Vanhoucke M.2012. Dynamic Scheduling: Integrating Schedule Risk Analysis with Earned Value Management. The Measurable News, (2): 11-13.

  • Vanhoucke M. Shtub A.2011. Adding value to earned value analysis. PM World Today, XIII(I)

  • Vanhoucke M.2010. Introducing optimization techniques to students: An exam case distribution model. INFORMS Transactions on Education, 10(2): 53-61.

  • Vanhoucke M.2010. Measuring time: an earned value performance management study. The Measurable News, (1): 10-14.

  • Vanhoucke M. Vandevoorde S.2009. Forecasting a project's duration under various topological structures. The Measurable News, (1): 26-30.

  • Vanhoucke M. Vandevoorde S.2008. Earned value forecast accuracy and activity criticality. The Measurable News, : 13-16.

  • Vanhoucke M.2008. Project tracking and control: can we measure the time?. Projects and profits, : 35-40.

  • Vanhoucke M. Vandevoorde S.2007. Measuring the accuracy of earned value/earned schedule forecasting predictors. The Measurable News, (Winter): 26-30.

  • Vanhoucke M.2007. Work continuity optimization for the Westerscheldetunnel project in the Netherlands. Tijdschrift voor Economie en Management, 52(3): 435-449.

  • Vanhoucke M.2006. Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1): 14-25.

  • Vandevoorde S. Vanhoucke M.2006. A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24(4): 289-302.

  • Vanhoucke M. Vereecke A. Gemmel P.2005. The project scheduling game (PSG): simulating time/ cost trade-offs in projects. Project Management Journal, 36(1): 51-59.

  • Vanhoucke M. Demeulemeester E.2003. The application of project scheduling techniques in a real-life environment. Project Management Journal, 34(1): 30-42.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2001. On maximizing the net present value of a project under renewable resource constraints. Management Science, 47(8): 113-1121.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2001. An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem. Annals of Operations Research, 102: 179-196.

  • Demeulemeester E. De Reyck B. Foubert B. Herroelen W. Vanhoucke M.1998. New computational results on the discrete time/cost trade-off problem in project networks. Journal of the Operational Research Society, 49(11): 1153-1163.

  • Sels V. Vanhoucke M.. Genetic algorithms for single machine scheduling problems: a trade-off between intensifications and diversification.

  • Vanhoucke M. Maenhout B.. Solution representation, diversity and space reduction: a computational experiment with metaheuristics.

Book Chapters

  • Vanhoucke M.2013. The impact of project schedule adherence and rework on the duration forecast accuracy of earned value metrics. Challenges and Developments. In: Hoffmann E. Ed. Project management: practices, challenges and developments (pp. 95-132). Nova Publishers.

  • Maenhout B. Vanhoucke M.2011. Days on and days off scheduling of pilots under a variable workload. In: Walsh C. Airline Industry: Strategies, Operations and Safety (pp. 193-212).

  • Vanhoucke M.2009. Static and dynamic determinants of earned value based time forecast accuracy. In: Handbook of Research on Technology Management's Planning and Operations (pp. 361-374).

  • Vanhoucke M.2007. De studie naar kwaliteit: een levenslange garantie?. (pp. 51-53).

  • Vanhoucke M.2006. Waarschuwingssystemen: Veel te vroeg of net te laat. (pp. 121-124). Roularta Media Group.

  • Vandevoorde S. Vanhoucke M.2006. Waar zit het tijdsaspect in een 'earned value'-meetsysteem?. (pp. 131-137). Roularta Media Group.

  • Vanhoucke M. Deschoolmeester D.2005. Supply chain management: waar de klant nog steeds koning is. (pp. 113-115).

  • Vanhoucke M.2003. Projectplanning - niet alleen tijd is belangrijk. (pp. 118-124).

Books

  • Vanhoucke M.2014. Integrated Project Management and Control: First comes the theory, then the practice. Springer.

  • Vanhoucke M.2013. Project Management with Dynamic Scheduling. Springer.

  • Vanhoucke M.2013. The art of project management: a story about work and passion. OR-AS.

  • Vanhoucke M.2012. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer.

  • Vanhoucke M.2009. Measuring time - Improving project performance using earned value management. Springer.

Conference Presentations

  • Vanhoucke M.2013. Integrated project controls: Using Operations Research methods to improve the efficiency of project control.

  • Maenhout B. Vanhoucke M.2011. Reactive personel scheduling: insights and policy decisions. Paper presented at 25th Annual Conference of the Belgian Operations Research Society, February 10-11, Ghent, Belgium.

  • Maenhout B. Vanhoucke M.2011. Project Scheduling and Staffing with a Multi-skilled Workforce. Paper presented at annual INFORMS 2011 meeting, November 13-16, Charlotte, North Carolina, United States.

  • Colin J. Vanhoucke M.2011. Statistical Project Control in Project Management: What can Simulations Teach Us. Paper presented at annual Informs 2011 meeting, November 13-16, Charlotte, North Carolina, United States.

  • Van Huele C. Vanhoucke M.2011. Combined Surgery Scheduling and Physician Rostering. Paper presented at annual INFORMS 2011 meeting, November 13-16, Charlotte, North Carolina, United States.

  • Sels V. Vanhoucke M.2011. A Hybrid Heuristic for the Machine Scheduling Problem with Parallel Machines. Paper presented at annual INFORMS 2011 meeting, November 13-16, Charlotte, North Carolina, United States.

  • De Jonghe T. Vanhoucke M.2011. An Efficient Solution Method for the Resource Availability Cost Problem. Paper presented at annual INFORMS 2011 meeting, November 13-16, Charlotte, North Carolina, United States.

  • Vanhoucke M. Cardoen B.2010. On the design of custom packs: grouping of medical disposable items for surgical procedures. Paper presented at 2010 EURO XXIV Conference, July 11-14, Lisbon, Portugal.

  • Maenhout B. Vanhoucke M.2009. Pilot crew rostering at Brussels Airlines: feasibility study and policy decisions. Paper presented at 23rd EURO conference, July 7-9, Bonn, Germany.

  • Maenhout B. Vanhoucke M.2009. Reactive nurse scheduling in hospitals. Paper presented at 4th Multidisciplinary International Conference on Scheduling: Theory and Applications, August 10-12, Dublin, Ireland.

  • Van Peteghem V. Vanhoucke M.2009. Introduction of learning effects in resource constrained projects. Paper presented at 23rd EURO conference, July 7-9, Bonn, Germany.

  • Sels V. Vanhoucke M.2009. Comparison of meta-heuristics for the single machine scheduling problem. Paper presented at 23rd EURO conference, July 7-9, Bonn, Germany.

  • Vanhoucke M.2009. A genetic algorithm for net present value maximization for resource constrained projects. Paper presented at 9th European Conference on Evolutionary Computation in Combinatorial Optimization, April 15-17, Tübingen, Germany.

  • Van Peteghem V. Vanhoucke M.2009. An artificial immune system for the multi-mode resource-constrained project scheduling problem. Paper presented at 9th European Conference on Evolutionary Computation in Combinatorial Optimization, April 15-17, Tübingen, Germany.

  • Van Peteghem V. Vanhoucke M.2008. Hybridized Scatter Search Heuristic for the multi-mode RCPSP. Paper presented at 11th International Workshop on Project Management and Scheduling (PMS), April 25-30, Istanbul, Turkey.

  • Vanhoucke M.2008. Measuring Time using novel earned value management metrics. Paper presented at 22nd IPMA World Congress, November 9-11, Rome, Italy.

  • Vanhoucke M.2008. Measuring time: an earned value simulation study. Paper presented at Meeting of the working group project management and scheduling of the German OR society, April 4-4, München, Germany.

  • Vanhoucke M.2008. Measuring Time: a simulation study of earned value metrics to forecast the total project duration. Paper presented at Annual Earned Value Conference for the UK, June 9-11, London, United Kingdom.

  • Vanhoucke M.2008. Measuring Time - Static and dynamic determinants of earned value based time forecast accuracy. Paper presented at 9th edition of the PMI BeNeLux Day, September 27-27, Sint Laureins, Belgium.

  • Vanhoucke M.2006. Scheduling an R&D project with quality-dependent time-slots. Paper presented at Technical Workshop on Optimization: Theories and Applications, May 8-11, Glasgow, United Kingdom.

  • Maenhout B. Vanhoucke M.2006. New computational results for the nurse scheduling problem: a scatter search algorithm. Paper presented at 6th European Conference on Evolutionary Computation in Combinatorial Optimization, April 10-12, Budapest, Hungary.

  • Debels D. Vanhoucke M.2006. The impact of parallel processing and set-up times on pre-emptive resource-constrained project scheduling. Paper presented at 21st European Conference on Operational Research (EURO XXI), July 2-5, Reykjavik, Iceland.

  • Maenhout B. Vanhoucke M.2006. Comparison of meta-heuristic procedures for the nurse scheduling problem. Paper presented at 21st European Conference on Operational Research (EURO XXI), July 2-5, Reykjavik, Iceland.

  • Vanhoucke M.2006. An efficient hybrid search procedure for various optimization problems. Paper presented at 6th European Conference on Evolutionary Computation in Combinatorial Optimization, April 10-12, Budapest, Hungary.

  • Debels D. Vanhoucke M.2006. Future research avenues for resource-constrained project scheduling: search space restriction or neighbourhood search extension?. Paper presented at 10th International Workshop on Project Management and Scheduling, April 26-28, Poznan, Poland.

  • Vanhoucke M. Maenhout B.2005. NSPLib - A Nurse scheduling problem library: a tool to evaluate (meta-)heuristic procedures. Paper presented at EURO Working Group on OR applied to Health Services, July 31-August 5, Southampton, United Kingdom.

  • Debels D. Vanhoucke M.2005. The Electromagnetism Meta-Heuristic Applied to the Resource-Constrained Project Scheduling Problem. Paper presented at Artificial Evolution Conference, October 26-28, Lille, France.

  • Debels D. Vanhoucke M.2005. A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem. Paper presented at Technical Workshop on Optimization: Theories and Applications, May 9-12, Suntec City, Singapore, Singapore.

  • Maenhout B. Vanhoucke M.2005. An electromagnetic Meta-heuristic for the Nurse Scheduling Problem. Paper presented at 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications, July 18-21, New York, United States.

  • Vanhoucke M.2003. Discrete time/cost trade-offs in project scheduling with time-switch constraints. Paper presented at EURO/INFORMS joint international meeting, July 6-10, Istanbul, Turkey.

  • Vanhoucke M. Coelho J. Tavares L. Debels D.2003. On the morphological structure of a network. Paper presented at EURO/INFORMS joint international meeting, July 6-10, Istanbul, Turkey.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2002. An enumeration algorithm for the max-npv problem with linear time-dependent cash flows.

  • Vanhoucke M. Demeulemeester E. Herroelen W.2001. Scheduling projects with progress payments. Paper presented at EURO 2001 Conference, July 9-11, Rotterdam, the Netherlands.

著作